The history is cornerstone of the
present time as well as challenge to the future.
The history is cornerstone of the
present time as well as challenge to the future.
| Bearing designation | Dimensions | Basic load rating | Maximum speed of rail vehicle | Detail and calculations | ||||
|---|---|---|---|---|---|---|---|---|
| d | D | B | F | Dynamic (Cr) | Static (Cor) | mm | kN | km.h-1 |
| PLC 410–13 | 120 | 240 | 80 | 150 | 553.000 | 742.000 | 160 | Show detail and calculations |
| PLC 410–13-2 | 120 | 240 | 80 | 150 | 553.000 | 742.000 | 160 | Show detail and calculations |
| PLC 410–14 | 120 | 240 | 80 | 150 | 553.000 | 742.000 | 160 | Show detail and calculations |
| PLC 410–14-2 | 120 | 240 | 80 | 150 | 553.000 | 742.000 | 160 | Show detail and calculations |
| PLC 410–15 | 130 | 240 | 80 | 159 | 517.000 | 752.000 | 160 | Show detail and calculations |
| PLC 410–15-2 | 130 | 240 | 80 | 159 | 517.000 | 752.000 | 160 | Show detail and calculations |
| PLC 410–16 | 130 | 240 | 80 | 159 | 517.000 | 752.000 | 160 | Show detail and calculations |
| PLC 410–16-2 | 130 | 240 | 80 | 159 | 517.000 | 752.000 | 160 | Show detail and calculations |
| PLC 410–33-2 | 130 | 240 | 80 | 157 | 540.000 | 775.000 | 200 | Show detail and calculations |
| PLC 410–34-2 | 130 | 240 | 80 | 157 | 540.000 | 775.000 | 200 | Show detail and calculations |